Case Studies / MG Construction - Private Build - Downpatrick

SDG worked with MG Construction to provide construction accessories for bespoke residential properties.

Downpatrick based MG Construction specialise in creating bespoke high end residential properties. MG Construction contacted SDG Construction Technology to provide various construction accessories for the project over the summer of 2018. One such product was our innovative Murfor Compact, which was used to reinforce the external masonry.

Murfor Compact offered a fast, simple and economical way of reinforcing masonry walls. Designed in to offer additional structural reinforcement, and to provide much needed crack control around crack endangered areas. Its compact size allowed for efficient and safe site storage.

Benefits include:

  • CE & ETA Approved
  • Fast & Simple to install
  • Structural Reinforcement
  • Crack Control

For further information on our Murfor Compact range please contact SDG

Share this case study
More Case Studies

SDG working with Todd Architects designed and supplied a unique jointing system of acoustic ceilings expertly installed by Castle Ceilings.

SDG working alongside Doran Consulting from design stage right through to advising the construction team on site reference installation best practice for bridge bearings at this Belfast project.

LIV Student Accommodation with over 11 floors of Shearail® used to increase the shear resistance of a slab, and safety transfers the shear load from the slab to the column.

At SDG our knowledge of the impact of the correct acoustics in different environments grows it is no surprise that the education sector is one area where you can’t afford to be complacent.

Through the use of the BT turnbuckle on these LIDL store projects it has been possible to reduce the temporary bracing, increase safety and shorten the assembly time for the precast wall elements , it ticks all our the boxes. We are excited to implement it in our future projects.

SDG have always gone above and beyond for us. With SDG’s technical support our team have the ability to use the most effective and innovative solutions to improve quality, save time and perform more effectively.

I spoke to Ciaran Donnelly and after a few subsequent drawings emailed back and forth we agreed on the detail. SDG had the assembly on site within 3 days and saved us a lot of time on site with cutting and welding. We were able to lower the assembly into place in one piece with no concerns. I would most definitely engage in this service again.

Ready to know how we can support your business?